Vogelzang International TR009 Betriebsanleitung

Stöbern Sie online oder laden Sie Betriebsanleitung nach Holzofen Vogelzang International TR009 herunter. Vogelzang International TR009 Operating instructions Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 24
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 1
This stove meets
U.S. Test Standard:
UL 1482-2006
Vogelzang International Corporation
400 West 17th Street
Holland, Michigan 49423
www.vogelzang.com
Phone: 1-616-396-1911
Fax: 1-616-396-1971
THE PERFORMER
HigH-EFFiciEncy WOOdsTOvE
EPA Certified (3.89 grams/hr.)
Model TR009 Owners Manual
(save this manual for future reference)
READ ALL INSTRUCTIONS CAREFULLY
BEFORE INSTALLING OR OPERATING
THIS STOVE. FAILURE TO FOLLOW
INSTRUCTIONS MAY RESULT IN PROP-
ERTY DAMAGE, BODILY INJURY, OR
EVEN DEATH.
DO nOT USE THIS STOVE IN A
MOBILE HOME, MANUFACTURED HOME,
TENT OR TRAILER – NO EXCEPTIONS!
Seitenansicht 0
1 2 3 4 5 6 ... 23 24

Inhaltsverzeichnis

Seite 1 - HigH-EFFiciEncy WOOdsTOvE

VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 1This stove meets U.S. Test Standard:UL 1482-2006Vogelzang International Corporation400 West 17th Stree

Seite 2 - SAFETY INSTRUCTIONS

Page 10 / TR009 PERFORMER™ VGZ-029 / 20110519.0MASONRY CHIMNEYBefore using an existing masonry chimney, clean the chimney, inspect the flue

Seite 3

VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 11Figure 17 - Chimney Construction through RoofFigure 18 - Chimney Connection to Firebox through Masonr

Seite 4 - TABLE OF CONTENTS

Page 12 / TR009 PERFORMER™ VGZ-029 / 20110519.0CHIMNEY CONNECTIONS continued …Consult your insurance company if you cannot find a qualified expert.CAUT

Seite 5 - ASSEMBLY INSTRUCTIONS

VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 13OPERATING INSTRUCTIONSTHIS STOVE IS DESIGNED TO BURN WOOD FUEL ONLY!Hardwood, 18” to 20” should be spl

Seite 6

Page 14 / TR009 PERFORMER™ VGZ-029 / 20110519.0continue to burn, open the air control to re-establish the secondary flames then slowly reset the air c

Seite 7 - LOCATING STOVE

VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 15SERVICE HINTS 7. Empty ashes regularly. Do not allow ashes to pile up (see Safety Instruc

Seite 8 - LOCATING STOVE continued…

Page 16 / TR009 PERFORMER™ VGZ-029 / 20110519.0WARNING: IN CASE OF CHIMNEY FIRE (1) CLOSE AIR INLET CONTROL (2) GET OUT OF THE HOUSE (3) CA

Seite 9 - CHIMNEY SIZING

VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 17SERVICE HINTS continued . . .For assistance involving chimney draft issues, con-tact a knowledgeable l

Seite 10 - CHIMNEY CONNECTIONS

Page 18 / TR009 PERFORMER™ VGZ-029 / 20110519.0ORDERING PARTS - TR009 PERFORMER™ STOVEWhen ordering missing or replacement parts, always give the Mod

Seite 11 - VENTING TO EXISTING FIREPLACE

VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 19PARTS - TR009 PERFORMER™ STOVEWhen ordering missing or replacement parts, always give the Model Number

Seite 12 - FIREPLACE INSTALLATION

Page 2 / TR009 PERFORMER™ VGZ-029 / 20110519.0SAFETY INSTRUCTIONSSAFETY NOTICE: IF THIS STOVE IS NOT PROPERLY INSTALLED, A HOUSE/BUILDING F

Seite 13 - OPERATING INSTRUCTIONS

Page 20 / TR009 PERFORMER™ VGZ-029 / 20110519.0WIRING DIAGRAM - MODEL F-6 BLOWER OPTION

Seite 14

VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 21FLOOR PROTECTOR MATERIAL CALCULATIONSThis stove has been tested for and must be installed on a oor pr

Seite 15 - OPERATING continued . .

Page 22 / TR009 PERFORMER™ VGZ-029 / 20110519.0A. Brick Masonry Minimum 3.5˝/89mm thick brick masonry all framed into combustible wall with a m

Seite 16 - SERVICE HINTS continued . .

VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 23

Seite 17

Page 24 / TR009 PERFORMER™ VGZ-029 / 20110519.0Vogelzang International Corporation400 West 17th StreetHolland, Michigan 49423www.vogelzang.comPhone:

Seite 18

VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 3or abuse. When installing your stove, use care in handling. Clean with soap and warm wate

Seite 19 - FIREBRICK ASSEMBLY

Page 4 / TR009 PERFORMER™ VGZ-029 / 20110519.0TABLE OF CONTENTSSAFETY PRECAUTIONS ...

Seite 20

VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 5ASSEMBLY INSTRUCTIONSTOOLS AND MATERIALS REQUIRED FOR INSTALLATION t o o l s 

Seite 21

Page 6 / TR009 PERFORMER™ VGZ-029 / 20110519.0Figure 7 – Attach Pedestal to Stove Body6. Position the pedestal top and attach with eight (8) machine

Seite 22 - C. Ventilated Thimble

VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 7LOCATING STOVE1. The stove must be placed on solid concrete, solid masonry, or when installed on a com

Seite 23

Page 8 / TR009 PERFORMER™ VGZ-029 / 20110519.0Figure 13a – Step 1, Bottom Firebrick ArrangementLOCATING STOVE continued…Figure 11a – Front View Minim

Seite 24 - Steve Vogelzang

VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 9CONNECTOR PIPE INSTALLATIONConnector pipe is used to make the connection from the final positioni

Kommentare zu diesen Handbüchern

Keine Kommentare